BRIDGE OVER RIVER DAO

Individual project made by me as a student at University of Minho, Portugal. The Bridge over River Dao has 3 spans of 120m+170m+100m. The project was modeled during my MSc Work in parallel to its construction in straight interaction with the contractor company (CASAIS SA). The model includes all concrete elements and most of the reinforcement (ordinary and prestress), together with information about the construction scheduling. Tekla Structures 19.1 was used, together with its “Task Manager” tool.